Federal / Institutional


U.S. Department of Veterans Affairs

VA Medical Center - Northport, NY

Demolition of existing ceilings, walls, piping, plumbing fixtures, exhaust fans, supply, return and exhaust system ductwork, etc. New General Construction includes new ceilings, structural steel, platforms, ladders, trim work, finishes, etc. New HVAC construction includes installing a new outdoor air handler (chilled water and steam piping), exhaust fans, and all associated ductwork, VAV boxes, reheat piping and controls.


U.S. Department of Veteran Affairs

Lyons, New Jersey

Scope of Work included mold remediation, demo, and renovation of room 115. Replacing ceiling grid, gypsum walls, and lighting. Providing new walls, ceiling and lighting fixtures, floors, base molding and electrical outlets and switches. Exterior brick pointing and caulking and mortar sealing of exterior walls and windows.


Sumpter Smith Air National Guard Base

Birmingham, AL

A joint project between the United States Air Force and Alabama Air National Guard. Scope of work included installation of custom engineered 50’ tall aluminum stair tower and engineered steel platform. Construction of 350 square foot building extension. Installation of various electrical and conduit upgrades


Columbus Citizens Foundation

New York, NY

Design build project consisting of a full investigatory phase, design, scoping, and roof repair process for the 127 year old four story town house located at 8 East 69th Street NY, NY. Construction rehabilitation included the patching and repair of the upper EPDM roofing system and waterproofing areas affected. Sheetrock and trim work was performed in areas previously damaged by water.


Daniel P. Moynihan Courthouse

500 Pearl St. New York, NY

Interior renovation within an actively occupied office space. Work was concentrated in Office Suite 829, Room 845, Conference Room 801. Work included demolition, carpentry, and finish work to include new carpeting/flooring, glass wall/doors, and painting.


Horseshoe Bend National Military Park

Daviston, AL

Resurfaced 8,000 LF of park trails at four (4) separate locations throughout the Park. The work included re-grading, stone placement/compaction and installation of retaining walls and water/erosion bars throughout.


Northport VA Medical Center

Northport, NY

Greenway USA, A the General Contractor, oversaw demolition and renovation of laboratory providing both anatomic (surgical pathology, cytopathology, autopsy) and clinical (laboratory medicine) pathology and physician required tests. Scope of work included furnishing and installation of a negatively pressurized work area, demolition, complete inventory, and installation of VA procured material, casework, floor tile, patching, painting and a complete MEP Package.